Click on the list or map locations below for further project details
Title | Description |
---|---|
Khor Al-Zubair Port Risk Assessment | Initial bathymetric, bottom tracking and sediment sampling surveys |
ESIA of new water and wastewater system | Environmental and Social Impact Assessment and management plan |
ESIA of new water and wastewater system | Environmental and Social Impact Assessment and management plan |
ESIA Terminal Development | Environmental and social impact assessment of new terminal within Umm Qasr Port. |
Iraq Port Geotechnical Assessment | Geotechnical assessment of two new berths |
Beorma Quarter (Phase 2 and 3) ES | Environmental Statement (ES) |
Water resource study | Analysis of the surface water quality and flow assessment of the watercourses |
Mud pit sampling | Sampling of mud and flare pits |
Tide Gauge Installation | Installation of tide gauge |
Power Station ESIA | ESIA for 100MW Temporary Power Project |
Port and Environmental Study | Environmental Survey of the Shatt Al-Arab Waterway and Qarmat Ali Canal |
Construction Environmental Monitoring | Pipeline construction environmental monitoring |
Pipeline EBS | Environmental Baseline Survey (EBS) |
Water resources study | KZP surface water assessment |
Environmental Study | Disposal of dredged materials |
KZP Water and Sediment Study | Water and sediment assessment around KZP |
Port Environmental and Social Study | KZP environmental and social study |
Marine Traffic Survey | Marine Traffic Survey around KZP |
Tide Gauge Installation | Installation of Tide Gauge |
Basra International Oil and Gas Hub (BIOGH) | Geo-Environmental Investigation |
WTPS Khor Al-Zubair Oil Terminal Project, Iraq | Environmental and Social Impact Assessment |