Project Portal

Click on the list or map locations below for further project details

TitleDescription
Iraq Port Geotechnical Assessment Geotechnical assessment of two new berths
Beorma Quarter (Phase 2 and 3) ES Environmental Statement (ES)
Water resource study Analysis of the surface water quality and flow assessment of the watercourses
Mud pit sampling Sampling of mud and flare pits
Tide Gauge Installation Installation of tide gauge
Power Station ESIA ESIA for 100MW Temporary Power Project
Port and Environmental Study Environmental Survey of the Shatt Al-Arab Waterway and Qarmat Ali Canal
Construction Environmental Monitoring Pipeline construction environmental monitoring
Pipeline EBS Environmental Baseline Survey (EBS)
Water resources study KZP surface water assessment
Environmental Study Disposal of dredged materials
KZP Water and Sediment Study Water and sediment assessment around KZP
Port Environmental and Social Study KZP environmental and social study
Marine Traffic Survey Marine Traffic Survey around KZP
Tide Gauge Installation Installation of Tide Gauge
Basra International Oil and Gas Hub (BIOGH) Geo-Environmental Investigation
WTPS Khor Al-Zubair Oil Terminal Project, Iraq Environmental and Social Impact Assessment